成人免费毛片小视频_欧美激情大陆偷拍_欧美黑人又大又粗XXXⅩ_999re6热在线精品视频思思_亚洲欧洲无码专区_国产日韩综合不卡免费观看_zyz玖玖色资源站先锋播放器_亚洲av片不卡无码久东京搔_黄色一级网址_免费鸡巴视频在线播放

Foshan Shengbang Steel Structure Co., Ltd.

11 years experience in plant design and construction

Common choice of 1875 sets of steel structure buildings

National service hotline:

0757-81002668
4News

Precautions for dismantling steel structure factory buildings

Hits:338 Time:2023-5-31
  

1、 Preparation before removal


Safety protection: Before removal, sufficient safety protection measures should be taken to ensure the safety of personnel and equipment. Especially for equipment suspended at high altitudes, anti-theft measures need to be taken to ensure safety.


Data collection: Before starting the removal, sufficient data collection and survey should be conducted to understand the internal situation of the steel structure factory building, confirm the location of important equipment and pipelines, and make a plan for the removal.


Construction Plan: Develop a detailed construction plan based on the survey results, clarify the content and progress of phased removal, prepare the necessary machinery and equipment for removal in advance, and develop an emergency plan.


Environmental protection treatment: During the removal process, attention should be paid to environmental issues, especially the treatment of sewage and waste, abide by relevant regulations, and try to reduce environmental pollution as much as possible.


2、 Precautions during the removal process


Removal sequence: When removing the steel structure factory building, the planned sequence should be followed. The smaller parts should be removed first, and then the large structures should be gradually removed to avoid affecting the stability and structural safety of the entire factory area.


Resource recycling: When dismantling steel structure factories, attention should be paid to classifying recyclable resources and minimizing waste as much as possible. For example, waste metal can be recycled, and waste such as concrete can also be recycled and reused.


Pipeline treatment: When removing pipelines and equipment, all water, electricity, gas, and other pipelines should be blocked first to prevent accidents. If it is necessary to dismantle pipelines and equipment for high-altitude operation, sufficient safety protection equipment should be equipped to prevent workers from accidentally falling.


Power outage removal: During the removal process, attention must be paid to blocking the power supply to prevent the occurrence of electrical accidents. At the same time, in order to prevent fires, non-invasive removal methods should be used to prevent sparks.


Quality supervision: During the removal process, quality should be checked at all times to ensure an orderly and safe removal process. The tension of lifting and stay cables should be checked to ensure the smooth progress of the removal work.


3、 Treatment after the removal of the factory building


Waste cleaning: After the removal of the steel structure factory building, waste cleaning and residue removal should be carried out. At the same time, it is necessary to clean the site and restore it to its original state to prevent any impact on the environment.


Storage of tools and machines: After the removal of the steel structure factory building, the tools and machines used need to be collected, counted, and properly stored for future use.


Resource recycling: After the removal is completed, potential materials that may be recycled should be sorted and classified to minimize resource waste and achieve sustainable development.