Hainan Steel News: Singapore item section steel work area EW33 main station all end
Hits:2035
Time:2015-5-30
Hainan Steel News: Singapore item section steel work area EW33 main station all end
May 27, after months of hard work to everyone, EW33 station steel body, have been completed, Singapore Transport Roads and Traffic Management Bureau of the achievements we have sent congratulations.
EW33 station construction began in the end of November 2014, including the S1-S10 main roof installation of steel structures and steel entrance canopy and bus stations and other ancillary steel cantilever canopy installation. In early January this year, at the call of the Party, the Singapore project launched a "crucial battle" wave production, in ensuring the safety of the situation and accelerate progress, reduce costs and improve efficiency. After careful research project, developed effective measures, one re-optimize the allocation of human resources, in personnel with high technical level and efficiency selection workers, eliminate poor technical capacity, with respect to foreign workers and Chinese workers share, also a reasonable allocation; the second is led by the technical department, optimize the construction program, the formation of production technology team dedicated to deal with tricky technical problems encountered during construction; third is domestic and 11 Bureau of the Han River Zoomlion active links, the establishment of Liaison Officer to ensure that installation of steel structures timely supply of materials and equipment. After brainstorming, develop plans to address the problem of raw material supply and personnel needs, but also the construction process, timely and expeditious manner to overcome the technical difficulties, to ensure that the time period of advance.
Singapore May intolerable heat, we braved the scorching sun, fighting day and night, with sweat and wisdom on earth Singapura pouring out a dazzling pearl, the successful conclusion of this station EW33 steel body, represent our 11th Bureau firmly rooted in sophisticated and foreign steel Mall technology, but also boosted the confidence we further open up overseas mall, the future construction process, we will continue to carry forward the hard work, spirit of hard study, and strive to the end of the three planned work period All stations steel task for the company to obtain greater honor. Hainan Steel